The Bulk Water Loading Station, currently located on Pinnacle Street in Brighton, needs to be replaced.
An Environmental Assessment is underway to determine a preferred location. One option is on Sharp Road, in Brighton’s Industrial Park.
Town administrators say final site selection will be based on environmental and natural resources, feasibility, costs, and integration with existing infrastructure.
Project details will be presented at a Public Information session Tuesday, August 23rd, between 4pm and 6pm in the Municipality of Brighton Council Chambers at 35 Alice Street.
